DC140V Output Voltage Emergency LED Conversion Kit for 20-400W LED Loads 180mins
Contact Supplier
Product Highlights
- 180-Minute Emergency Backup: Provides 180 minutes of emergency lighting duration with a 12W Li-ion battery.
- Wide Voltage Compatibility: Supports AC90-280V input and DC18-140V output for 20-400W LED loads.
- CE and RoHS Certified: Meets international safety and environmental standards with CE and RoHS certification.
- OEM and ODM Services: Offers full customization from samples, designs, or minor adjustments for clients.
- Flexible Shipping Options: Ships via DHL, UPS, FedEx, or sea freight from Netherlands or China for fast delivery.
Product Attributes
- Customization
- Available
- Certification
- ISO, CE, RoHS
- Warranty
- 5 Years
- Model NO.
- DF168-30H
- Input Voltage
- AC90-280V
- Output Voltage
- DC18-140V
- Emergency Power
- 12W
- Emergency Time
- 180mins
- Battery
- Li-ion Battery 11.1V 4400mAh
- Lamp Power
- 12-300W
- Green LED
- Main Power
- Yellow LED
- Malfunction
- Red LED
- Charging
- Transport Package
- 50PCS/CTN
- Specification
- 260*60*60mm
- Trademark
- DF
- Origin
- China
- HS Code
- 8504401400
- Production Capacity
- 100000PCS Per Month
- Package Size
- 49.00cm * 33.00cm * 15.00cm
- Package Gross Weight
- 15.000kg
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of DC140V Output Voltage Emergency LED Conversion Kit for 20-400W LED Loads 180mins
Find Similar Products
Product Description
| Model | DF168-30H |
| Input Voltage | AC90-280V |
| Emergency Power | 12W Max.20W |
| Duration Time | 180mins |
| Battery | Li-ion Battery 11.1V 4400mAH |
| Output Voltage | DC18-140V |
| Product Size | 260*60*60mm |
| Certification | CE ROHS |
| Temperature Range | -10 to 50 ºC |
| Warranty | 2-3Years |









About the Supplier
This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASI242976". Items marked "" are certified.
Company Profile
Dongguan Dengfeng Green Energy Technology Co., Ltd. Was established in September 2022, it has three manufacturing plants, namely Shenzhen Dengfeng (founded in 2009), Jiangxi Dengfeng (founded in 2018), Dongguan Dengfeng (established in 2022). Products include but are not limited to: New energy technology research and development, online and offline energy storage power supply, emergency power supply and lighting product research and development, solar and wind power related to household energy storage grid-connected or off-grid power supply technology research and development, production, sales and service, battery sales, portable outdoor power supply, communication UPS, uninterruptible power supply (UPS) emergency power supply (EPS) distributed energy storage power station, semiconductor optoelectronic products design and development, sales and service; Sales, investment, R&D, design, installation, construction and maintenance, operation of charging facilities for new energy vehicles, etc. The automated production equipment of Dengfeng factory is highly efficient, and the testing instruments are advanced and precise to ensure that each product is of high quality and stable and reliable. The certificates include ULETLTUVCBCEROHSMSDSUN38.3 and so on. Dengfeng has more than 3, 000 square meters of warehouses in Europe, and more than 30 people in the R&D, sales and service team in the Netherlands.
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory
- Address
- 4th Floor, Building 9, Vanke Gemdale Sky City, Songshan Lake, No. 871 Songfo Road, Dalang Town, Dongguan City, Guangdong Province
-
Plant Area
- 500 square meters
-
Number of Employees
- 11
-
Registered Capital
- 5,000,000 RMB
-
Terms of Payment
- T/T, LC, D/P, PayPal, Western Union, Small-amount payment
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR, EXW
-
Average Lead Time
-
Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays, one month -
Nearest Port
- Shenzhen Port
-
Minimum Order Quantity
- 1Pcs
-
Supply Chain Partners
- 3
Our Production Capability & Technical Expertise
-
Main Products
- LED Emergency Light, LED EXIT Sign Light, LED Emergency Driver, Uninterruptible Power Supply, Portable Power Station, Electronic Candle Light.
-
Production Lines
- 4
-
Production Machines
- SMT line, DIP line, Divided container, Spot welding machine, Automatic sorting machine
-
QA/QC inspectors
- 6 people
-
Inspection Type for Finished Products
- 100% inspection(Visual inspection & Function inspection)
-
Inspection Method for Finished Products
- Have instructions and uniformly followed
-
Customization Options
- Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 2 people
-
Traceability of Raw Materials
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2022-09-22
-
Export Year
- 2 Years
-
Main Markets
- Southeast Asia/ Mideast
-
Repeat Buyers Choice
- 50%~80%
-
Number of Foreign Trading Staff
- 7
-
Overseas Agent/Branch
- No
-
New Products Launched in Last year
- Yes
Our Certifications, Standards & Industry Recognition
-
Cooperated with Fortune 500
- No
FAQ
- Are you a manufacturer or trading company?
- We are a manufacturer with two independent plants established in 2009, covering 20,000 square meters. We also have a European company in the Netherlands for faster sample delivery.
- What is the minimum order quantity (MOQ)?
- The standard MOQ is 100 PCS, or 500 PCS for new models. However, we accept small trial orders of 10 PCS from stock for some products.
- How long does delivery take?
- Samples from the Netherlands take 1-3 days. Air freight takes 3-7 days, while large sea freight orders take about 40 days, subject to customs clearance.
- Do you offer discounts?
- Yes, we provide discounts for large quantities or multiple styles to ensure better profit margins for our customers.
- What certifications do your products have?
- Our products have numerous tests and certifications, including CE and RoHS. We can also test according to specific customer requirements.
- What is the warranty period?
- The warranty period is typically 2-3 years, as specified in the product parameters.
Send your message to this supplier
People who viewed this also viewed
-
US$9.00-9.20 / Piece
-
US$19.70-19.90 / Piece
-
US$12.50-12.90 / Piece
-
US$6.99 / Piece
-
US$28.00-28.80 / Piece
-
US$9.60-9.90 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- LED Emergency Driver
- Medium Power (100W-1000W) Emergency Driver
- DC140V Output Voltage Emergency LED Conversion Kit for 20-400W LED Loads 180mins
Related Categories
Hot Searches
- LED Driver Factories
- LED Power Supply Factories
- LED Controller Factories
- Emergency Battery Factories
- Emergency Batteries
- Emergency Pack
- Energy Emergency
- Emergency Cables
- Emergency Communication
- Emergency LED Kit Bulkbuy